AUTHOR

Get done meeting

leave with 20+ bugs assigned to myself


Smiley
better than 20 bugs assigned to 20 different people. i prefer to have one dev who knows what theyre doing on a project than 10 different ones with 10 different ways of handling them, half of which arent correct.
lol, these bugs involve tons of people each Smiley Smiley Smiley

Quick reply

Sign in to post a message.
Smileys

Times shown in Eastern Time (ET).