AUTHOR

orphanelf, heres your next one

Which of the following tasks is NOT performed during the execution phase of a project?



A Providing project reports to stakeholders

B Conducting life cycle reviews

C Measuring the successful knowledge transfer from team members to operations personnel

D Utilizing a formal change control process



I'ma say B again.
orphanelf quote:
I'ma say B again.
that one was C, god I've gone through 500 of these today...
quetzecoatl quote:
that one was C, god I've gone through 500 of these today...
Damn.

Quick reply

Sign in to post a message.
Smileys

Times shown in Eastern Time (ET).