AUTHOR

feral, is the blue ridge parkway closed all winter

or just yesterday?
I think all winter.Smiley
feral quote:
I think all winter.Smiley
i just looked, its not weather related
The Parkway will be closed from Milepost 399 at Pine Mountain Tunnel to Milepost 405 at NC Route 151 beginning November 1, 2010 and continuing into early spring 2011. Due to dangerous conditions in the work zone, all traffic by foot, bicycle, and motor vehicle will be prohibited. For southbound traffic, follow NC Route 191 to NC Route 280, interconnecting to US Route 276 in Brevard and back to the Parkway south of Pisgah Inn. The detour can be taken in the opposite direction for northbound traffic.
quetzecoatl quote:
i just looked, its not weather related
The Parkway will be closed from Milepost 399 at Pine Mountain Tunnel to Milepost 405 at NC Route 151 beginning November 1, 2010 and continuing into early spring 2011. Due to dangerous conditions in the work zone, all traffic by foot, bicycle, and motor vehicle will be prohibited. For southbound traffic, follow NC Route 191 to NC Route 280, interconnecting to US Route 276 in Brevard and back to the Parkway south of Pisgah Inn. The detour can be taken in the opposite direction for northbound traffic.
yeah, they were working on it all summer

Quick reply

Sign in to post a message.
Smileys

Times shown in Eastern Time (ET).