AUTHOR

wired two 3-phase 240v electrical panels today

6 2-pole branch circuits per phase


taking questions
Wat
momeraths quote:
Wat
im an electrician now i dont move furniture for a shitty living anymore
Running off delta or wye?
Taz_66 quote:
Running off delta or wye?
neutral in the center i believe thats wye setup? it was volunteer work actually today so it wasn't some technical thing, just had a journeyman teaching me what to do not so much the terms but the actual work itself terminating properly
taz i took a photo of the first single phase box i hooked up today too i was proud., hold on
Center tapped is a wye system, I wonder if it was 208/120? Your single phase voltage would be 138v if you were in a wye system, though 240 might be the nominal voltage out in your parts for wye.
__lame quote:
taz i took a photo of the first single phase box i hooked up today too i was proud., hold on
Holding, I'll share one of mine, too Smiley
*slowly backs out of thread*
momeraths quote:
*slowly backs out of thread*
Just electrifyin...
Taz_66 quote:
Holding, I'll share one of mine, too Smiley
i guess i deleted the one of the box actually open after i sent it to my father...but whatever. this is the first box i ever terminated in by myself haha. this was a single phase, ran all the cable through ground boxes and legit did that shit by myself. up til now all ive done at work is install solar panels. photo doesnt show much but i'll probably look back at this one day and laugh.

youre probably wondering why there are just wires hanging out of the box and why we didn't run conduit but that's because its for a drive-thru christmas lights display that our local volunteers to do every year at a park, the cars pay 10 bucks to drive through and see the lights and most of the money goes to charity for handicapped kids. no sense running rigid when its only gonna be up for a few weeks ya know
This was from the summertime, wired up seven 750kcm parallel runs feeding new 1600 amp switchgear. Powered one 750hp motor and two 350hp motors, in addition to refeeding some old panels.



(These neutrals were an absolute bitch to wire in)
__lame quote:
i guess i deleted the one of the box actually open after i sent it to my father...but whatever. this is the first box i ever terminated in by myself haha. this was a single phase, ran all the cable through ground boxes and legit did that shit by myself. up til now all ive done at work is install solar panels. photo doesnt show much but i'll probably look back at this one day and laugh.

youre probably wondering why there are just wires hanging out of the box and why we didn't run conduit but that's because its for a drive-thru christmas lights display that our local volunteers to do every year at a park, the cars pay 10 bucks to drive through and see the lights and most of the money goes to charity for handicapped kids. no sense running rigid when its only gonna be up for a few weeks ya know

Yeah code allows provisions for temporary lighting, so you're good there. I'm sure I'll be doing the same with some of the photos I've taken, but you have to take pride in some of the work you've done. Especially when you do it right; there's no shame in that.
Also, I wish you would've been on the day I posted this
lol those neutrals on the left tell me they didn't go in last....


nice though, that shit was clean. i wish you could see inside that nasty old box though, i trimmed all my conductors (even neutral and ground) to perfect length before i termed them on the ground and neutral bars. it was sized perfectly and looked so clean. was truly proud of my work today
Taz_66 quote:
Also, I wish you would've been on the day I posted this
haha dude it was 40 degrees out today, needless to say we were also working on a beach and so every single box connector had sand in it and was a bitch to tighten, as well as every single cable being a bitch to work with because skinning them in the cold it like 3x harder...
Guy my bulbs keep burning out can you help.
i have bucket full of ends too im just saving it all til next summer when i can lay it out in my driveway and really have at it. clean copper is worth almost double what you get for just wire itself in the jacket and worth like 65% more than it is dirty. like obviously you could just throw it all in a fire and melt the insulation off but it loses so much value you're an asshole if you do that, you might as well just save up a few barrels of it and make a day out of it. if you have some heavy gauge stuff and you have a barrel for it, take a saturday to do it and it might as well be a day's pay or even a lot more
__lame quote:
lol those neutrals on the left tell me they didn't go in last....


nice though, that shit was clean. i wish you could see inside that nasty old box though, i trimmed all my conductors (even neutral and ground) to perfect length before i termed them on the ground and neutral bars. it was sized perfectly and looked so clean. was truly proud of my work today
No those were the first ones I did. Although, it sucked, because I had to recrimp them, the shop brought out the wrong crimper, and, considering the amount of juice flowing through them, didn't want to have shoddy crimps.

Boxes, especially at the beach, or facilities where fine particles are an issue, suck. Major. Ass.
This is badass. I now feel inadequate for the 12v system I'll be installing sometime in the next few months.

Quick reply

Sign in to post a message.
Smileys

Times shown in Eastern Time (ET).