AUTHOR

Gosmack this is pretty much what you'll start

off doing
and that looks like a smaller rig too
Looks like fun. Keep the hands on the yellow handles if you want to keep them.
this is what I did for the longest time on a Super Triple size rig

I got to chill up top and just toss them pipe stems all day
Hopefully I hear something soon. I applied with Patterson in TX.
Gosmack quote:
Hopefully I hear something soon. I applied with Patterson in TX.
Patterson and Chesapeake are two of the Biggest companies out here so you should be good trying with either one of them
KaizerSoze quote:
this is what I did for the longest time on a Super Triple size rig

I got to chill up top and just toss them pipe stems all day
Since I have been up here in ND, I've seen a number of rigs that have that process automated.
Gosmack quote:
Since I have been up here in ND, I've seen a number of rigs that have that process automated.
yeah those rigs are expensive as fuck, it's called like and "iron hand" or something like that. they hardly ever break down and never drop pipe, those things are why I got laid off.
KaizerSoze quote:
yeah those rigs are expensive as fuck, it's called like and "iron hand" or something like that. they hardly ever break down and never drop pipe, those things are why I got laid off.
I checked Chesapeake and they want their guys living within 6 hours of their rigs. I would be making a 14 hour commute for it. Not sure if they'll make the exception.

Quick reply

Sign in to post a message.
Smileys

Times shown in Eastern Time (ET).